high performance auto parts carburetor performance

The Amazing

There is a Vortex Valve™ for every engine, everywhere.

Get your Vortex Valve today
Lifetime Workmanship Guarantee

Every day you go without a Vortex Valve™ is throwing money away.

Peterbilt Cummins® 1985 Vortex Valve™ Installation

KING OF THE ROAD. 1985 PETERBILT RUNNING A CUMMINS® BIG CAM 3 - 400. THIS BABY'S GOT EVERYTHING BUT AN INTERCOOLER.

KING OF THE ROAD. 1985 PETERBILT RUNNING A CUMMINS® BIG CAM 3 - 400. THIS BABY'S GOT EVERYTHING BUT AN INTERCOOLER.

Real-world test results are in!. You can view full test results from one of our satisfied customers here.

  • Peterbilt Cummins® 1985 view 1
  • Peterbilt Cummins® 1985 view 2
  • Peterbilt Cummins® 1985 view 3

UNDER 5 MINUTE INSTALL ON A PETERBILT CUMMINS® 1985

Increased Mileage, Power & Torque
Only $69.95 US

Installing a Vortex Valve™ on your Peterbilt Cummins® 1985 is as easy as 1,2,3.

Step 1

Peterbilt Cummins® 1985 install step 3 Make sure the engine is off. Always wear gloves when working on machinery that is not running. We must remove the air intake duct where it meets the manifold. The section we must remove is cast-iron. It straddles the engine in the picture at the left. It has four 9/16" bolts on the end where it connects to the manifold. The first thing we do is loosen the 7/16" bolt on the upper clamp on the round (other) end of the air intake manifold.

On the 4-bolt end of the duct there may be a nozzle for starter fluid. It has to be disconnected. Remove the four 9/16" bolts and remove the air intake duct.


Step 2

Peterbilt Cummins® 1985 install step 3 When the air intake duct is removed it looks like this. We install an experimental 4309-8RXC Vortex Valve™in the opening that leads to the manifold like the picture at the right.


Step 3

Peterbilt Cummins® 1985 install step 3 Check to make sure the gasket for the connection is OK. Replace the air intake manifold, tighten the four 9/16" bolts, reconnect and tighten the starter fluid nozzle, if necessary. Tighten the top clamp on the round (other) end of the air duct. You are ready for the road or wall-to-wall traffic with plenty of extra power, torque and response and great mileage too.


Savings

Guarantee

Your Vortex Valve(s)™ will be on its way to you within 7 working days. There are a few special applications and these may take a week or two longer. Your Vortex Valve™ is 100% guaranteed against any defects in workmanship and materials. Your Vortex Valve™ is made in the USA with high quality stainless steel that's made here too.

Air Synergy Labs, Inc offers a Lifetime replacement guarantee on workmanship and any manufacturer defects as long as you own the vehicle on which it is installed.